
We had a great time meeting with students at Kettle Moraine Lutheran High School to discuss careers in engineering and architecture last week! The school is currently under construction for a building addition that includes new classroom space for their increasing enrollment. The second floor contains chemistry and biology labs and the first floor has phased construction consisting of seven new classrooms, as well as office space for staff. The building addition is 25,000 square feet and Catalyst Construction is the general contractor. We’re excited to be working with them on this expansive project, and even more thrilled to share the fields of engineering and architecture with their students!